Blueprint & Plans Analysis — Bank Branch Renovation.

An anonymized example of the deep AI plans analysis BidEngine produces from a real subcontractor bid package. Client name, address and third-party vendor identities have been redacted; every other detail — quantities, scope notes, risks, scheduling considerations — is the verbatim platform output.

Project Snapshot
Project Type
Interior Bank Branch Renovation
Square Footage
4,625 SF
Bidding Scope
Selective Demo · Flooring · Painting
Program Context
Multi-location Refresh Lite (25 sites)
Schedule
13-week window · Jun–Sep 2026
Executive Overview

Comprehensive interior refresh of an existing 4,625.75 SF bank branch — one of seven locations included in the 2026 Refresh Lite Program covering 25 sites across five states. The renovation focuses on interior finishes, furniture replacement, and technology upgrades within customer-facing spaces while preserving the building structure, mechanical systems, and back-of-house infrastructure.

The existing branch includes 5 active teller positions, 2 24-hour ATMs, 9 workstations, and a drive-up teller facility. Pre-Construction begins May/June 2026, construction commences June 19, 2026, with completion required by September 22, 2026 — a tight 13-week construction window.

Scopes identified (GC responsibility)
  • Div 02 — Selective demo: furniture, carpet tile, ACT, HVAC grills, light fixtures, legacy branding
  • Div 06 — Millwork: check desks, wood ledge sill & base prep + paint (P-1)
  • Div 08 — Doors & frames: paint P-1 semi-gloss; window film + sunshades to BL-1
  • Div 09 — Primary scope: flooring, wall paint (Benjamin Moore Chantilly Lace 2121-70), ceiling grid
  • Div 26 — Lighting: full LED retrofit, GC-coordinated with [Vendor G]
  • Div 32 — Final cleaning & post-construction services
Risks & coordination flags
  • ! 13-week schedule is tight against multi-vendor coordination
  • ! Vault carpet status requires client confirmation before removal
  • ! Bank security governs construction access — vault requires bank supervision
  • ! Electrical service room must remain operational throughout construction
  • ! Vendor sequencing: [Vendor C] furniture must follow flooring completion
  • ! Open question: are [Vendor G] LED & [Vendor A] re-laminate mandatory or 'suggested'?
  • ! Open question: does the bank remain open during construction? Phasing impact on 13-week window
Separate Vendor Scopes (GC coordination only)
[Vendor A]
Teller line re-laminate
[Vendor B]
New check desks supply
[Vendor C]
Lobby furniture install
[Vendor E]
Branding / merchandising
[Vendor F]
Branded music / audio integration
[Vendor G]
LED lighting retrofit
Client Security
CCTV & alarm systems
What the AI did
  • Parsed every drawing sheet, schedule and spec page
  • Identified bidding scopes and quantified work items
  • Flagged scheduling, access and operational risks
  • Cross-referenced finishes, demo and MEP coordination
What you get
  • Structured plans analysis tied to your bidding scope
  • Trade-by-trade scope breakdown with assumptions
  • Prioritized risk register with mitigations
  • Coordination notes so nothing is missed at bid time
16-page redacted plans analysis · verbatim BidEngine output Download PDF