Blueprint & Plans Analysis — Bank Branch Renovation.
An anonymized example of the deep AI plans analysis BidEngine produces from a real subcontractor bid package. Client name, address and third-party vendor identities have been redacted; every other detail — quantities, scope notes, risks, scheduling considerations — is the verbatim platform output.
Comprehensive interior refresh of an existing 4,625.75 SF bank branch — one of seven locations included in the 2026 Refresh Lite Program covering 25 sites across five states. The renovation focuses on interior finishes, furniture replacement, and technology upgrades within customer-facing spaces while preserving the building structure, mechanical systems, and back-of-house infrastructure.
The existing branch includes 5 active teller positions, 2 24-hour ATMs, 9 workstations, and a drive-up teller facility. Pre-Construction begins May/June 2026, construction commences June 19, 2026, with completion required by September 22, 2026 — a tight 13-week construction window.
- ● Div 02 — Selective demo: furniture, carpet tile, ACT, HVAC grills, light fixtures, legacy branding
- ● Div 06 — Millwork: check desks, wood ledge sill & base prep + paint (P-1)
- ● Div 08 — Doors & frames: paint P-1 semi-gloss; window film + sunshades to BL-1
- ● Div 09 — Primary scope: flooring, wall paint (Benjamin Moore Chantilly Lace 2121-70), ceiling grid
- ● Div 26 — Lighting: full LED retrofit, GC-coordinated with [Vendor G]
- ● Div 32 — Final cleaning & post-construction services
- ! 13-week schedule is tight against multi-vendor coordination
- ! Vault carpet status requires client confirmation before removal
- ! Bank security governs construction access — vault requires bank supervision
- ! Electrical service room must remain operational throughout construction
- ! Vendor sequencing: [Vendor C] furniture must follow flooring completion
- ! Open question: are [Vendor G] LED & [Vendor A] re-laminate mandatory or 'suggested'?
- ! Open question: does the bank remain open during construction? Phasing impact on 13-week window
- ● Parsed every drawing sheet, schedule and spec page
- ● Identified bidding scopes and quantified work items
- ● Flagged scheduling, access and operational risks
- ● Cross-referenced finishes, demo and MEP coordination
- ● Structured plans analysis tied to your bidding scope
- ● Trade-by-trade scope breakdown with assumptions
- ● Prioritized risk register with mitigations
- ● Coordination notes so nothing is missed at bid time
Stop guessing. Start winning bids.
Live in 15 minutes. First bid analyzed today.